Project location: Cixi, Zhejiang Province, China
Hourly output:20,000 pcs-25,000pcs (standard bricks)
Raw materials: Silt, construction waste
This clay brick project used a typical brick making engineering process with two type raw materials mixtures. The main material is silt, which is rubbed by double rollers crusher after stone removal, and the auxiliary material is building waste, which is sieved after hammer crushing, and the two materials are mixed and for aging. At the same time, the project adopts one and half green brick stacking and for firing technology, the green bricks are firstly stacked by a robot to the kiln car for 7 layers, and then enter the drying room for drying through green brick storage line. After drying completed, green bricks will be stacked higher from 7-layer to 14-layer and after that the dried bricks enter into firing kiln for sintering.
The tunnel kilns with cross-section of 3.7m, six tunnels for baking and three tunnels for burning, with an annual output of 150-200 million pieces (equivalent to Chinese standard bricks).
Video of running:
Name: General Manager
Mobile:+8613151630928
Whatsapp:+8613222235952
Email:sales@bricmaker.com
Add:No.1, Huayu Road, Donglai Development Zone, Zhangjiagang City, Jiangsu, China
We chat